A Look Inside the Lillard Science Center Construction Site Posted on April 25, 2017April 25, 2017 by Matthew Demirs Related Post LFC Students Election Reactions Lake Forest College Students Organize Walkout for Palestine Protest Policy Changes Sparks Student Concern Sexual Assault Awareness Month on Campus Practice Makes Poltergeist 2nd floor offices Look from the 1st floor entrance into the second floor Classroom located in basement. Basement hallway 3rd floor Front entrance Second floor runway which will lead into Johnson B Basement classroom Young Hall, Views from the top. Johnson A Basement Classroom Hotchkiss Hall, Donnelley and Lee Library, and the water basin, also called a retention basin, to be installed to drain rainwater from the buildings. Johnson B Roof, in the bottom right-hand corner, there is a strip of roof dedicated for the rooftop garden. Donnelley and Lee Library